“Reduced Load Period” took effect on March 1, 2021. Signage has been posted on all affected roads. The reduced load period will remain in place until the frost has completely left the affected roads.
“Reduced Load Period” took effect on March 1, 2021. Signage has been posted on all affected roads. The reduced load period will remain in place until the frost has completely left the affected roads.
© 2018 All rights reserved. Corporation of the Township of Baldwin
**For staff use only.